Hyderabad Metro Phase-II Proposal Undergoes Intensive Discussion led by N.V.S. Reddy

Update: 2024-01-07 18:08 GMT
Hyderabad Airport Metro Rail Ltd managing director N.V.S. Reddy headed a brainstorming session on Sunday. (Image:Twitter)

Hyderabad: Hyderabad Airport Metro Rail Ltd managing director N.V.S. Reddy headed a brainstorming session on Sunday to discuss the modified Metro Phase-II proposal, particularly on which segment of the Nagole-LB Nagar-Mailardevpalli-Shamshabad Airport route should be designated as a through line, and which part should function as a spur line. The meeting also discussed the proposal to extend the MGBS-Falaknuma line by 1.5 km to Chandrayangutta, to meet the airport line. It also discussed whether the existing signalling and train control system be used or a newer one adopted.

Tags:    

Similar News